PROJECT : New Carquinez Bridge
LOCATION: Vallejo, CA
CONSTRUCTION VALUE: $500 Million
OWNER: State of California Dept. of Transportation (Caltrans)
ARCHITECT: Buckland & Taylor/Parsons, Caltrans Engineering Service Ctr./OPAC – Steinman JV
GENERAL CONTRACTOR: FCI Constructors/Cleveland Bridge California JV
Key Features:
- 3,465 feet long, nation’s first suspension bridge built in 35 years
- Aggressive bidding schedule requiring every day for work
- Superstructure is a steel orthotropic deck section
- Fabricated in Japan and shipped in three ocean going barges
Signet provided quality control welding inspection and testing services for this new bridge after construction had already begun, staffing the project with certified AWS/ASNT inspectors and technicians. Our scope included mechanical testing of welding procedures and visual welding inspection of steel pipe piles. Inspection work was performed to both AWS D1.1 and AWS D1.5 codes and all reports were reviewed and approved by the project Quality Control Manager.